x
Breaking News
More () »

Wednesday Traffic and Construction Delays

Northwest Arkansas: Fayetteville- Armstrong Ave. – Stone Bridge Road will see delays in construction zones while crews widen State Highway 16 from two lanes to ...
roadwork

Northwest Arkansas:

Fayetteville- Armstrong Ave. – Stone Bridge Road will see delays in construction zones while crews widen State Highway 16 from two lanes to four lanes with sidewalks and bike lanes. Traffic signals will be installed at three intersections. Should be complete by early 2015.

I-49– Slowdowns expected in Washington County as crews work to widen the Johnson Mill Blvd. overpass and access ramps on Interstate 49. This project is expected to be completed later this year.

Hwy. 112- Spur will see delays. It’s being widened from two to four lanes.

Fayetteville- HWY 112 (Razorback Rd) is under construction for widening from MLK to Nettleship.

Hwy. 16– near Porter Rd. will see delays. The project plans to widen portions of I-49 to six lanes.

Hwy. 265- ALL lanes closed between Don Tyson Pkwy. and Joyce Blvd. from July 7-30th.

Hwy. 265- Delays are expected while crews widen portions of Hwy. 265 from E. Joyce Blvd in Fayetteville to the Hwy. 412 exit in Springdale.  This project is expected to be completed in mid-2015.

Fayetteville– Van Asche Dr and Ball Ave between Jupiter Ave and Gregg Ave will be closed June 13-August 15th.  Van Asche Dr will also be closed from McGuire St to Garland Ave until early September.

Fayetteville- The south side of Lafayette and the west side of Mock Ave will be closed, detours will be marked.  The project will run June 23rd-August 4th.

Fayetteville- S. Washington Ave between South St. and E 4th St will be closed until July 9th.

Springdale- Lane closures expected for the next three weeks between Exit 69 in Johnson and Exit 72 in Springdale. Construction will continue on the Don Tyson Parkway Interchange. Traffic will be down to one lane each night, from 8 p.m. to 3 a.m. Mon. – Fri. The project aims to build an interchange between I-540 and Don Tyson.

Springdale- The intersection of 48th St. and Johnson Mill Blvd. will be closed from 9 am to 3 pm July 1st and 2nd. East and West bound traffic will still be allowed, but northbound traffic will be rerouted.

Hwy. 264– Delays are expected near the Wagon Wheel exit of Interstate 49 due to an ongoing Hwy. improvement project.  The purpose of this project is to widen 2.5 miles of Interstate 49 to three lanes in Benton County.

Prairie Grove- Portions of the Hwy. 62 bypass will see delays while crews work on construct east and west connections.  This project will be completed in Mid-2014.

Bella Vista Bypass- Delays are expected on Hwy. 72 due to a highway land widening project.  This construction is expected to conclude in early 2016.

Centerton- Delays are expected near Greenhouse Road on Hwy. 102B while crews widen nearly two miles of the highway.

Huntsville– One passing of lane Hwy. 412 in Carroll County is under construction.  Expect delays.

Avoca-North Garfield- U.S. Hwy 62 is being widened to five lanes. The project is expected to be finished by early 2015.

West Fork – Crews are working to overlay a 2-mile stretch of U.S. Hwy 71.

River Valley:

Hwy. 71-Hwy. 22- Delays are expected on this 5.8 mile stretch while crews work to pave Hwy. 71 near Fort Chaffee south of Van Buren in Sebastian County.  This project will be completed in mid-2014.

Hwy. 71– Lane closures from Elmwood Cutoff to Howard Hill Rd. Expect delays in the area through the end of July.

Hwy. 22– Crews will be overlaying more than 2 miles of Highway 22 at Fort Chaffee.

Seeing slowdowns?  Let us know, just tweet:  #5traffic

Before You Leave, Check This Out