SUBIACO (KFSM) — A fiber-optic company broke through a 10 inch water line in Subiaco on Monday (July 18).
Mayor Bobby Sewell said the repair would last 2-3 hours.
He said the boil order could last up to two days.
SUBIACO (KFSM) — A fiber-optic company broke through a 10 inch water line in Subiaco on Monday (July 18).
Mayor Bobby Sewell said the repair would last 2-3 hours.
He said the boil order could last up to two days.